A. Reservoir Properties and formation damage
1) Types of Completion
· Reservoir completions
· Completion architecture
· Sand control completions
· Artificial lift
· Cased and perforated – perforating.
2) Completion architecture
3) Completion equipment – Intervention requirements. Reliability, maintenance and repair of the completion.
4) Wireline.
· Slickline
· E-line
· Wireline fishing.
5) Coil tubing equipment and operations.
6) Hydraulic workover
7) Rig based interventions and workover.
8) Risk management for interventions.
9) Intervention fluids – brine and filtration.
10) Production related problems.
· Wax, scale, asphaltines, hydrates, reservoir souring, water production.
11) Water and gas shut-off techniques.
12) Remedial cementing
13) Stimulation
· Propped fracs and acid fracs.
14) Production start up following interventions and workover.
· HPHT intervention considerations.
· Sub-sea interventions